With Worktivity integrated into project management systems, Perform Engineering could monitor team performance in real time, track project durations accurately, and pinpoint inefficiencies. This led to faster decision-making, reduced wasted labor hours, and optimized resource allocation across construction projects.
Worktivity: Core Tool for Construction Project Success
By integrating with project management tools, Worktivity became a central operational platform for Perform Engineering. Real-time project duration data allowed the company to identify bottlenecks, plan resources efficiently, and improve scheduling accuracy, supporting sustainable growth and operational excellence.
Measurable Productivity and Cost Improvements
-
30% increase in overall productivity
-
15% reduction in labor costs
-
Optimized team allocation across projects
-
20% faster project delivery times through precise duration tracking
-
Enhanced transparency and speed in task tracking and project management
Conclusion: Data-Driven Project and Workforce Management
Perform Engineering’s success demonstrates how construction companies can leverage integrated time tracking and project management tools to optimize labor costs, streamline workflows, and accelerate project delivery. Real-time insights and accurate duration tracking transformed project planning, resource allocation, and workflow efficiency.



